Arizona solar warranty and roof rules for installers

What warranty and roof duties does Arizona put on a solar installer?

The minimum warranty periods

Arizona sets a floor for solar device warranties. Collectors, heat exchangers and storage units need at least two years, or an energy production guarantee.

Every other component needs at least one year. So a warranty page that gives all parts the same short term will meet the floor only for the parts that are not collectors, exchangers or storage.

The floor governs what you promise, not what the manufacturer does. If the manufacturer's coverage is longer, say so, but you cannot promise less than the statute's minimum on your own workmanship and equipment.

2 years / 1 yearSolar energy device warranties must run at least two years, or carry an energy production guarantee, for collectors, heat exchangers and storage units, and at least one year for all other components. — Arizona Legislature, A.R.S. 44-1762, retrieved 2026-09-29

The written warranty statement and the filing

Manufacturers and installers must give the buyer a written statement of the warranty. It states what responsibilities are assumed and what is disclaimed.

Performance data for the device and its components goes with it, with the sources of that data named. The statement's form is subject to Registrar approval, and a copy is filed with the Registrar as a public record.

Treat the filing as a compliance task with an owner, not a one-off. When you change a supplier or a warranty term, check whether the filed statement still matches what you hand to customers.

Manufacturers and installers must give a written warranty statement and performance data, with a copy filed with the Registrar as a public record. — Arizona Legislature, A.R.S. 44-1762, retrieved 2026-09-29

Roof duties before and after the install

For roof installations the statute puts three duties on the contractor. Evaluate the roof's capacity, recommend a licensed roofing inspection, and accept responsibility for damage the installation causes.

The first two happen before contract. Put the capacity evaluation and the inspection recommendation in writing and date them.

The third is the one that costs money. Damage from your install is your responsibility, so photograph the roof before you start and after you finish. The contract checklist adds the customer-side roof acknowledgment, which covers a different risk: repair or replacement over the life of the agreement.

For roof installations, contractors must evaluate roof capacity, recommend a licensed roofing inspection and accept responsibility for damage caused by the installation. — Arizona Legislature, A.R.S. 44-1762, retrieved 2026-09-29

Codes and manufacturer instructions

Install to local fire, safety and building codes and to the manufacturer's installation requirements. The statute lists both as installer standards.

The customer's side of the interconnection rules points the same way. The customer's facility must meet all applicable construction, safety and electric codes, and equipment must be installed to protect utility personnel and the public.

In practice, keep the manufacturer's installation manual in the job file. If a code inspector or a warranty claim asks what you followed, the manual is the answer.

Solar installers must comply with local fire, safety and building codes and with manufacturer installation requirements. — Arizona Legislature, A.R.S. 44-1762, retrieved 2026-09-29

Interconnection rules require a customer's facility to meet all applicable construction, safety and electric codes and to protect utility personnel and the public. — Arizona Administrative Code R14-2-2604, Cornell LII, retrieved 2026-09-29

Homeowner association limits on solar

A deed restriction that effectively prohibits installing or using a solar energy device is void and unenforceable. That rule is the reason most customers can proceed even when a neighborhood covenant reads as a ban.

The exception is old. Documents executed before April 17, 1980 are outside the rule.

Advise customers to check the date of their covenants before they assume the ban is void. If an association objects to a permitted install, send the customer the statute rather than arguing the point yourself.

April 17, 1980A covenant or restriction in a deed or contract that effectively prohibits installing or using a solar energy device is void and unenforceable, except for documents executed before April 17, 1980. — Arizona Legislature, A.R.S. 33-439, retrieved 2026-09-29

Questions

Do the warranty minimums apply to a solar lease?

The device statute sets warranty minimums for solar energy devices generally. The lease statute adds a disclosure rule, so any warranty shorter than the lease term must appear in bold and be initialed by the lessee.

Who files the warranty statement with the Registrar?

The statute puts the filing on the party who furnishes the written warranty statement, with a copy filed with the Registrar as a public record. Check who that is in your supply chain.

Am I liable if a roof leaks after the install?

The statute makes the contractor responsible for damage that the installation causes. Damage from an unrelated cause is a different question, so document the roof's condition before and after.

Can an HOA ban rooftop solar in Arizona?

A restriction that effectively prohibits a solar energy device is void, except for documents executed before April 17, 1980. Reasonable rules on placement are a separate question this page does not cover.