Getting an Arizona contractor licence to install solar
How does a business get licensed to install solar in Arizona?
- Confirm the work needs a licence before you bid it
- Choose a residential, commercial or dual licence
- Name a qualifying party with four years of experience
- Pass the written exam within two years of applying
- Qualify as a solar contractor with the solar exam
- Post the bond or cash deposit for your class
- Pay the biennial licence fee and recovery fund assessment
- Wait for the licence before you bid or pull permits
Arizona requires a licence before you even bid
You need a contractor licence in good standing before you bid a solar job, not only before you start it. Arizona treats the bid itself as engaging in the business.
The rule reaches individuals, firms, partnerships and corporations alike. A company name on the estimate does not move the requirement onto someone else. The licence must be in the name of whoever offers the work.
Solar has its own second rule on top. Arizona makes it unlawful to install, alter or repair a solar device without qualifying as a solar contractor. The rest of this guide is the path through both rules, in the order you meet them.
Arizona makes it unlawful to engage in contracting, submit a bid or respond to a request for qualification without a contractor's licence in good standing. — Arizona Legislature, A.R.S. 32-1151, retrieved 2026-09-29
June 30, 1980Since June 30, 1980, it has been unlawful for a contractor to install, alter or repair a solar device without qualifying as a solar contractor. — Arizona Legislature, A.R.S. 32-1170.01, retrieved 2026-09-29
The qualifying party is the person the licence rests on
A licence is held by a business, but it is earned by one named person. Arizona calls that person the qualifying party, and the business designates them on the application.
The qualifying party needs four years of practical or management trade experience. At least two of those years must fall inside the last ten. Up to two years of accredited technical training can stand in for experience.
The exam is written and must be taken no more than two years before you apply. Plan the timeline backwards from the date you want to bid. If the qualifying party leaves later, the business has a licence problem, so name someone who will stay.
4 yearsThe qualifying party needs four years of practical or management trade experience, at least two within the last ten years, and a written exam taken no more than two years before application. — Arizona Legislature, A.R.S. 32-1122, retrieved 2026-09-29
The solar qualification sits on top of the trade licence
Holding a trade licence does not by itself let you install solar. You also qualify as a solar contractor, which means a separate exam.
That exam must be specific to the solar requirements of the classification you hold or seek. Once you pass, the Registrar marks the licence to show the qualification within its scope of work.
The installation statute repeats the point from the other side. An installer must hold licensed solar contractor status and the general contractor licence that fits the device. The classes page explains how the electrical and solar-thermal classes divide the work.
A solar contractor applicant must pass an exam the Registrar approves that is specific to the solar requirements of the licence classification held or sought. — Arizona Legislature, A.R.S. 32-1170.02, retrieved 2026-09-29
Solar energy device installers must hold licensed solar contractor status and the appropriate contractor licence for the device type. — Arizona Legislature, A.R.S. 44-1762, retrieved 2026-09-29
Bond, licence fee and recovery fund before it issues
The licence does not issue on exam results alone. You post a bond or cash deposit sized to your class, and you pay the biennial fee.
For a specialty commercial contractor under $150,000 in annual volume the bond is $2,500. A specialty residential contractor posts between $1,000 and $7,500. Residential applicants also pay a recovery fund assessment of up to $600 per licence period.
These are statutory ceilings and bands. The exact figure billed to you is the Registrar's to set. The cost breakdown lays the numbers side by side.
$1,000 to $7,500A specialty residential contractor bond is not more than $7,500 and not less than $1,000, and a specialty commercial contractor under $150,000 in volume posts $2,500. — Arizona Legislature, A.R.S. 32-1152, retrieved 2026-09-29
$600Residential contractors pay a recovery fund assessment of not more than $600 during the biennial licence period. — Arizona Legislature, A.R.S. 32-1126, retrieved 2026-09-29
Do not pull a permit while the application is pending
Wait for the licence in hand before you pull a permit or put workers on a roof. Arizona treats those acts as evidence that a contract exists.
Courts may read a permit application or a crew on site as proof that you were contracting. If you were not yet licensed, that evidence works against you. It does not matter that the paperwork was already in the mail.
Use the wait to prepare instead. Draft your contract to the requirements in the contract checklist, and set up the company entity if you have not. Then start selling on the day the licence issues.
Securing governmental permits or employing workers on a construction project is prima facie evidence of a contract under the licensing statute. — Arizona Legislature, A.R.S. 32-1151, retrieved 2026-09-29
Questions
Can I sell a solar system before my licence issues?
No. Arizona counts submitting a bid as engaging in the business, so an estimate before the licence issues is itself unlicensed contracting. Wait for the licence, then start quoting.
Does a dual licence cost more than a residential one?
Yes. The statute caps the original biennial fee for a specialty dual licence at $1,350, against $350 for specialty residential. The cost breakdown page sets the fee caps side by side.
Do I need a separate exam for solar?
Yes. Arizona requires a solar-specific exam tied to the classification you hold or seek, in addition to the written trade exam taken for the licence itself.
How long is the experience requirement?
The qualifying party needs four years of practical or management trade experience, with at least two inside the last ten years. Accredited technical training can replace up to two of the four years.